Barwaaqo Cement Company
Industrial tank installation and heavy component lifting for a cement plant — a tandem lift coordinated between our Liebherr LTM 1070 and 80-tonne P&H flagship.
From cement plants to bridges, water infrastructure to port operations — every photo below is from an actual Hijaz job site. Documented work, real clients, no stock imagery.
Industrial tank installation and heavy component lifting for a cement plant — a tandem lift coordinated between our Liebherr LTM 1070 and 80-tonne P&H flagship.
Water infrastructure project — elevated water tank installation and supporting equipment for the municipal water network.
Bridge construction support and heavy structural lifting — two bridge installations in the Balcad and Afgooye corridor.
Cargo handling, vessel support and heavy lifting operations at Mogadishu Port — container moves and port-yard logistics.
Industrial facility expansion and construction support for a Mogadishu-based food manufacturer — structural lifts and equipment installation.
Structural steel erection and warehouse construction support — curved-frame steel roof and structural lifts.
Steel-frame erection and warehouse development across multiple sites — long-span trusses, columns and roof structures.
BTS tower installation and section lifting for one of Somalia's major telecom operators — multiple sites supported.
Two communications towers installed in the Lafoole corridor — section-by-section lifts and final assembly.
★ All photos shown above are from real Hijaz job sites. Additional case studies, on-site documentation and client references available on request.